My Vehicles ()
|
Schmelz Countryside
Alfa Romeo & Fiat: (651) 968-1244
Volkswagen: (651) 243-4287

Used 2024 Alfa Romeo Stelvio Ti AWD w/Activ Asst

← Go Back
Price: $37,990
Get My E-Price
  • Stock #: 960475C
  • VIN: ZASPAKBN3R7D76655
  • Mileage: 5380
  • Engine: 2.0 L
  • Exterior Color: Alfa Rosso
  • Interior Color: Black Heated Leather
  • Transmission: Automatic
Quick Quote
Schedule Test Drive
Get Pre-Approved
Trade-In Appraisal
Make an Offer
Check Availability
Request More Info
X
Dealer Comments:
SPECIAL FACTORY PURCHASE - Alfa Corporate Driven Turbocharged SUV with only 5k Miles! Save Thousands off MSRP New $ 54,840. Remaining 4 Year 40,000 Mile FACTORY WARRANTY with a CLEAN Accident Free Vehicle History Report. Basque in Italian Design and Performance with this Classic Alfa Red TI ALL WHEEL DRIVE with SUNROOF & NAVIGATION. Features Include LEATHER Heated Front & Rear Seats - DUALPANE SUNROOF - ACTIVE ASSIST PLUS Package with (Blind Spot Monitor, Cross Path Detection, Forward Collision Alert with Braking, Adaptive Pace Keeping Cruise Control, Traffic Sign Recognition, Lane Departure Warning with Lane Keeping, Traffic Jam Assist, Intelligent Speed Control), 8.8Inch Display with HD Radio and SiriusXM Satellite Radio, 20 INCH 5 HOLE GLOSS BLACK ALLOYS, BLUETOOTH Connectivity with Streaming Audio, Apple CarPlay, Android Auto, USB Ports, BACKUP CAMERA, Dual Power Seats with Driver's Memory, DUAL ZONE CLIMATE Control, Auto Headlamps, Power Hands Free Liftgate, Wireless Charging Pad, Homelink Universal Opener, REMOTE START including Cell Phone Connectivity, Keyless Access with PUSH to START, Power Sunroof/Moonroof Sunshade, HEATED STEERING WHEEL, Rear Backup Sonar Sensors, and Many Best In Class Performance Statistics!
Schmelz Countryside is Family Owned and Operated delivering affordable European Engineering SINCE 1966 and is a Factory Authorized Alfa Romeo & FIAT Dealer in Minnesota! All Schmelz Pre-Owned vehicles are fully inspected to meet our safety and quality standards You will see a difference in our vehicles! Ask to see our full pre delivery inspection report, complimentary AutoCheck Vehicle History Report and market comparison.

Disclaimer:

Here is the Disclaimer for vdp Used Vehicles. Max payload/towing estimate ratings shown. Additional options, equipment, passengers, and cargo weight may affect payload/towing weights. See dealer for details.

Click to call sales

While great effort is made to ensure the accuracy of the information on this site, errors can occur. Please verify all pricing and installed equipment information with a customer service representative. This is easily done by calling us or visiting us at the dealership.

We improve our products and advertising by using Microsoft Clarity to see how you use our website. By using our site, you agree that we and Microsoft can collect and use this data. Our privacy statement has more details.